杨金威, 潘婷, 周翔, 安振山, 向奕帆, 丁祎. 中亚天然气管道乌国段AB/C线联合运行方案比选[J]. 油气储运, 2021, 40(5): 596-600. DOI: 10.6047/j.issn.1000-8241.2021.05.018
引用本文: 杨金威, 潘婷, 周翔, 安振山, 向奕帆, 丁祎. 中亚天然气管道乌国段AB/C线联合运行方案比选[J]. 油气储运, 2021, 40(5): 596-600. DOI: 10.6047/j.issn.1000-8241.2021.05.018
YANG Jinwei, PAN Ting, ZHOU Xiang, AN Zhenshan, XIANG Yifan, DING Yi. Comparison between joint operation schemes for Lines AB/C of Central Asia‒China Gas Pipeline in Uzbekistan[J]. Oil & Gas Storage and Transportation, 2021, 40(5): 596-600. DOI: 10.6047/j.issn.1000-8241.2021.05.018
Citation: YANG Jinwei, PAN Ting, ZHOU Xiang, AN Zhenshan, XIANG Yifan, DING Yi. Comparison between joint operation schemes for Lines AB/C of Central Asia‒China Gas Pipeline in Uzbekistan[J]. Oil & Gas Storage and Transportation, 2021, 40(5): 596-600. DOI: 10.6047/j.issn.1000-8241.2021.05.018

中亚天然气管道乌国段AB/C线联合运行方案比选

Comparison between joint operation schemes for Lines AB/C of Central Asia‒China Gas Pipeline in Uzbekistan

  • 摘要: 中亚天然气管道在实际施工中,在哈国段C线建了8处跨接线,实现了AB线与C线的互联互通,同时在乌国段C线建了8处预留。借鉴哈国段联合运行的经验,若在乌国段的合适位置增设跨接,可进一步提高全系统的综合能力。基于此,建立了中亚管道AB线与C线联合运行的仿真模型,确定了不同总输量下AB线与C线的最优输量分配方案,并分别测算在乌国段8处预留增设跨接线后的运行效果;同时,假设土气、乌气两种气源分别出现故障停输事故工况,对增设跨接线的系统增输方案进行比选,最终选择在乌国段4处预留位置增设跨接线。研究成果可为实际工程改造、后续生产运行提供借鉴。

     

    Abstract: In the actual construction of Central Asia-China Gas Pipeline, 8 cross-over lines were set up for Line C in Kazakhstan, achieving the interconnection between Lines AB and C. Meanwhile, 8 reserved points were provided along Line C in Uzbekistan. With the experience of the joint operation in Kazakhstan section, the comprehensive capacity of the whole system can be further improved if cross-over lines are added at appropriate positions in the Uzbekistan section. For this purpose, a simulation model was established for the joint operation of the Lines AB/C of Central Asia–China Gas Pipeline, the optimal distribution principle of Lines AB and C under different total throughput was determined, and the effect of operation with cross-over lines added at the 8 reserved points in Uzbekistan section was estimated respectively. Additionally, comparison was made for the throughput increasing schemes of the system with cross-over lines by assuming that the emergency shutdown occurred at the gas resources of Turkmenistan and Uzbekistan, and finally, it was determined to add cross-over lines at 4 reserved points in Uzbekistan. Hence, the research results could provide reference for the practical engineering reformation and the subsequent production.

     

/