Abstract:
As the gas station is an important part of urban natural gas transmission and distribution system, the level of its construction management has a very significant impact on construction quality, project schedule, investment benefit and safe operation of gas station after it is put into service. An important way to improve the construction management of gas station is to constantly innovate the construction management methods and the technical means. Taking a large gas station in Tangshan Harbour Economic Development Zone as research object, where the Building Information Modeling(BIM) technology was applied to the construction management of gas station for the first time, research on the application of BIM technology in the station planning and design, simulation of complex process construction, integrated management of pipeline network, cost control and facility management of gas station was carried out, and a construction management method of gas station based on BIM was proposed. The practice shows that BIM technology can significantly improve the construction management level of gas station, and ensure the realization of construction quality target, schedule target and investment benefit of the station, which further provides reference for the construction management of similar project.