寒冷地区输气管道站场保温设置模拟

Simulation of thermal insulation setting of gas pipeline station in cold regions

  • 摘要: 中国寒冷地区输气管道站场日益增多,但对站场保温设置的重要性认识不足。为了保障站场运行安全,节约运行成本,开展了站场保温设置原则及必要性研究。通过模拟保温对停输管道温降的影响,分析了保温设置对维持管壁温度的效果;通过模拟保温对站内热损失的影响,分析了保温设置对节约运行成本的效果。研究结果表明:设置保温对维持停输后管壁温度、降低站内温降损失效果显著。提出以下原则:根据达到设计输量年限确定站场是否设置保温;加热设备选型需要充分考虑站内温降等工艺参数。该研究成果已在中国东北地区哈沈线、中俄东线等工程中应用,并可进一步指导后续同类工程的建设。

     

    Abstract: Stations of gas transportation pipeline are increasing in cold regions, but the thermal insulation setting of gas pipeline stations is not cognized sufficiently and does not get enough attention. In this paper, the setting principles and necessity of thermal insulation in gas pipeline stations were investigated in order to increase operation safety and save operating cost of the stations. The effects of thermal insulation on temperature drop of shutdown pipeline were analyzed to understand how thermal insulation maintains the wall temperature of pipelines. Then, the effects of thermal insulation on heat loss in the station were analyzed to figure out the effect of thermal insulation setting on operation cost saving. It is indicated that setting thermal insulation plays a remarkable role in maintaining pipe wall temperature after shutdown and reducing heat loss of temperature drop in the station. And finally, the principle was proposed to determine whether to set thermal insulation according to the years reaching the design throughput, and it was recommended to take full consideration of the temperature drop in the stations when the types of heating equipments are selected. The research result has been applied to Harbin-Shenyang Gas Pipeline and China-Russia Eastern Gas pipeline in Northeast China. And it can provide the guide for the construction of similar gas pipeline projects in the future.

     

/