方卫林, 杨萍, 高良泽, 胡江锋, 徐春燕, 李振军, 董旭. 西部成品油管道被评价管段内腐蚀直接评估[J]. 油气储运, 2018, 37(5): 501-508. DOI: 10.6047/j.issn.1000-8241.2018.05.004
引用本文: 方卫林, 杨萍, 高良泽, 胡江锋, 徐春燕, 李振军, 董旭. 西部成品油管道被评价管段内腐蚀直接评估[J]. 油气储运, 2018, 37(5): 501-508. DOI: 10.6047/j.issn.1000-8241.2018.05.004
FANG Weilin, YANG Ping, GAO Liangze, HU Jiangfeng, XU Chunyan, LI Zhenjun, DONG Xu. Internal corrosion direct assessment on the evaluated pipeline section in West China Products Pipeline[J]. Oil & Gas Storage and Transportation, 2018, 37(5): 501-508. DOI: 10.6047/j.issn.1000-8241.2018.05.004
Citation: FANG Weilin, YANG Ping, GAO Liangze, HU Jiangfeng, XU Chunyan, LI Zhenjun, DONG Xu. Internal corrosion direct assessment on the evaluated pipeline section in West China Products Pipeline[J]. Oil & Gas Storage and Transportation, 2018, 37(5): 501-508. DOI: 10.6047/j.issn.1000-8241.2018.05.004

西部成品油管道被评价管段内腐蚀直接评估

Internal corrosion direct assessment on the evaluated pipeline section in West China Products Pipeline

  • 摘要: 运用液体石油管道内腐蚀直接评估方法(LP-ICDA) 对西部成品油管道被评价管段进行内腐蚀直接评估, 包括预评估、间接检测、详细检查及后评估4个步骤。在预评估阶段, 收集整理该管段内腐蚀直接评估的相关数据; 在间接检测阶段, 建立多相流模型, 分别预测该管段正常输送期间与停输期间的内腐蚀风险分布, 并且考虑运行前期水相状态的影响, 综合分析该管段内腐蚀风险位置; 通过详细开挖检查, 对该管段是否存在内腐蚀进行确认; 在后评估阶段, 对该管段再评估时间间隔进行分析。评估结果表明: 该管段存在内腐蚀, 但管道强度未受到显著影响, 仍可在允许的安全压力下运行。

     

    Abstract: In this paper, the internal corrosion of evaluated pipeline sections in West China Products Pipeline was evaluated directly by means of the Liquid Petroleum-Internal Corrosion Direct Assessment method (LP-ICDA), which is divided into four steps, i.e., pre-assessment, indirect inspection, detailed examination and post-assessment. In the pre-assessment step, the data related with the internal corrosion direct assessment of the pipeline section is collected and ordered. In the step of indirect inspection, the multiphase flow model is established and then used to predict the distribution of internal corrosion risk in the period of normal transportation and in the period of shutdown, respectively. Furthermore, the effect of water facies in the early stage of operation is taken into consideration, and the positions of internal corrosion risk in this section are analyzed comprehensively. In the third step, the internal corrosion of this pipeline section is confirmed by means of detailed excavation examination. And in the post-evaluation step, re-assessment time interval of this pipeline section is analyzed. It is shown that this pipeline section suffers internal corrosion, but the pipeline strength is not affected significantly, so it can be still operated under the allowable safety pressure.

     

/