朱力挥, 罗东坤. 碳酸盐岩油气藏地面工程管控难点及对策[J]. 油气储运, 2016, 35(8): 909-912. DOI: 10.6047/j.issn.1000-8241.2016.08.021
引用本文: 朱力挥, 罗东坤. 碳酸盐岩油气藏地面工程管控难点及对策[J]. 油气储运, 2016, 35(8): 909-912. DOI: 10.6047/j.issn.1000-8241.2016.08.021
ZHU Lihui, LUO Dongkun. Management and control difficulties in the surface engineering of carbonate reservoirs and their countermeasures[J]. Oil & Gas Storage and Transportation, 2016, 35(8): 909-912. DOI: 10.6047/j.issn.1000-8241.2016.08.021
Citation: ZHU Lihui, LUO Dongkun. Management and control difficulties in the surface engineering of carbonate reservoirs and their countermeasures[J]. Oil & Gas Storage and Transportation, 2016, 35(8): 909-912. DOI: 10.6047/j.issn.1000-8241.2016.08.021

碳酸盐岩油气藏地面工程管控难点及对策

Management and control difficulties in the surface engineering of carbonate reservoirs and their countermeasures

  • 摘要: 碳酸盐岩具有成藏规律复杂、开发规模大、高产但不稳产的特点,因此碳酸盐岩油气藏地面工程项目管控面临巨大困难与挑战:在产量不确定的情况下,由于地质条件多变,产建规模不配套;在快速上产的压力下,难以合规、高效地开展工程建设。基于此,运用系统管理、风险管理及项目管理等理论与方法,并结合碳酸盐岩油气田的管理模式,提出了加强碳酸盐岩油气藏地面工程项目管控的解决措施:归纳识别影响项目建设程序的因素,建立勘探、开发、建设一体化的项目组织体系。通过塔里木油田塔中地面工程项目建设实例应用的结果表明:一体化模式和项目管理方式的联合运用,大大提高了碳酸盐岩油气藏地面工程建设项目决策的科学性和建设效率。

     

    Abstract: Carbonate reservoirs are characterized by complex accumulation laws, large-scale development, and high-yield unstable production, so their project management and control of surface engineering are faced with great difficulties and challenges as follows. First, geological conditions are various, so productivity is not matched with construction when the production rate is uncertain. And second, it is difficult to carry out high-efficiency engineering construction in compliance with the regulations when it is required to produce rapidly. In order to solve these difficulties, the following countermeasures were proposed by the theories and methods of system management, risk management and project management, combined with the management modes of carbonate oil and gas field. It is necessary to identify and summarize the influential factors of project construction programs and establish the integrated project organization system of exploration, development and construction. These countermeasures were applied practically to the project construction of Tazhong surface engineering in the Tarim Oilfield. And it is indicated that project decision rationality and construction efficiency can be improved significantly when the integrated model and the project management mode are used jointly for the surface engineering construction of carbonate reservoirs.

     

/

返回文章