彭太翀, 王多才, 赵廉斌. Quantum热备系统主备切换扰动问题[J]. 油气储运, 2016, 35(1): 107-111. DOI: 10.6047/j.issn.1000-8241.2016.01.020
引用本文: 彭太翀, 王多才, 赵廉斌. Quantum热备系统主备切换扰动问题[J]. 油气储运, 2016, 35(1): 107-111. DOI: 10.6047/j.issn.1000-8241.2016.01.020
PENG Taichong, WANG Duocai, ZHAO Lianbin. Disturbances during active-standby switchover of Quantum hot standby system[J]. Oil & Gas Storage and Transportation, 2016, 35(1): 107-111. DOI: 10.6047/j.issn.1000-8241.2016.01.020
Citation: PENG Taichong, WANG Duocai, ZHAO Lianbin. Disturbances during active-standby switchover of Quantum hot standby system[J]. Oil & Gas Storage and Transportation, 2016, 35(1): 107-111. DOI: 10.6047/j.issn.1000-8241.2016.01.020

Quantum热备系统主备切换扰动问题

Disturbances during active-standby switchover of Quantum hot standby system

  • 摘要: 为了解决Modicon Quantum CHS 110热备系统在主备切换过程中存在的电动调节阀误动作的扰动问题, 在站场PLC系统程序中增加了测试逻辑, 对出现数值变化的变量进行检测, 记录变量瞬间变化的数值及对应时间, 结合热备系统工作原理, 研究导致设备误动作的直接原因和根本原因。研究表明: Quantum热备系统主备切换时, 调节阀误动作的直接原因是相关变量数值发生了初始化, 根本原因是PLC系统程序设计时的内存分配不合理, 造成热备模块间数据传送时间过长, 主备切换过程中数据丢失。因此, 解决该问题, 应该从PLC系统程序内存分配和程序修改着手。

     

    Abstract: During active-standby switchover of Modicon Quantum CHS 110 hot standby system, some electric control valves may generate malfunctions. To solve the problem, test logics are added in PLC system programs in stations to detect variants with numerical changes to record their instantaneous values and corresponding time. Combined with the principles of the hot standby system, direct and root causes for malfunctions of relevant units are studied. Research results show that, during active-standby switchover of the Quantum hot standby system, direct cause for malfunction of the control valve is the initialization of relevant variants, whereas the root cause is the prolonged data transmission among hot standby modules and relevant data losses due to improper allocation of memories in programming of the PLC system. To solve these problems, memory allocation and software programming of the PLC system should be modified.

     

/

返回文章
返回