彭祥, 胡峻, 徐铭. 管道建设项目后评价的成功度评价法[J]. 油气储运, 2014, 33(6): 632-635. DOI: 10.6047/j.issn.1000-8241.2014.06.013
引用本文: 彭祥, 胡峻, 徐铭. 管道建设项目后评价的成功度评价法[J]. 油气储运, 2014, 33(6): 632-635. DOI: 10.6047/j.issn.1000-8241.2014.06.013
PENG Xiang, HU Jun, XU Ming. Success degree evaluation method for post-evaluation of pipeline project[J]. Oil & Gas Storage and Transportation, 2014, 33(6): 632-635. DOI: 10.6047/j.issn.1000-8241.2014.06.013
Citation: PENG Xiang, HU Jun, XU Ming. Success degree evaluation method for post-evaluation of pipeline project[J]. Oil & Gas Storage and Transportation, 2014, 33(6): 632-635. DOI: 10.6047/j.issn.1000-8241.2014.06.013

管道建设项目后评价的成功度评价法

Success degree evaluation method for post-evaluation of pipeline project

  • 摘要: 基于我国现阶段成功度评价法尚未成为项目后评价主要方法的现状,以管道建设中站场增输扩容改造项目为例,探讨研究成功度评价法在项目后评价中的应用。介绍了成功度评价法的特点、使用范围、项目成功度等级的含义,建立了包括项目目标层、评价层、分析层和操作层共4个层次的项目后评价体系,通过专家问卷调查法,从项目目标、建设运营过程、经济效益、影响以及持续性5个方面对建设项目进行后评价,得到相关重要度及评价等级数据,计算出每个评价指标的权重和加权等级,进而得到项目综合成功度评价结果。最后,根据评价结果分析站场增输扩容改造项目的实施情况,总结建设项目管理经验,并对具体应用时需注意的若干问题给出了建议。应用实例表明:成功度评价法在项目后评价工作中具有准确性和有效性,可以在管道建设项目后评价工作中推广应用。

     

    Abstract: In China, success degree evaluation has not yet become the primary post-evaluation method. Under this background, the paper discusses the application of the success degree evaluation method in post-evaluation of terminal capacity expansion under a pipeline project. The characteristics and application scope of the method and the definition of "success magnitude" are described, and a post-evaluation system is established with four layers, i.e., target layer, evaluation layer, analysis layer and operating layer. By questionnaire survey, a post-evaluation of project is carried out from five aspects, including project objectives, construction and operation process, economic efficiency, influence and sustainability. Relevant data of importance and evaluation levels are obtained and weight and weighting level of each indicator are calculated. Then, results of comprehensive success degree evaluation of the project are deserved. With these results, implementation of terminal capacity expansion is analyzed, and experiences of project management are summarized. Recommendations are also given on several issues to be concerned in practical applications. It is concluded that the success degree evaluation method has exhibited accuracy and effectiveness in post-evaluation, and can be popularized in pipeline projects.

     

/