张石超, 钱祖国, 杨凡, 李键, 李洪烈. 西气东输站场压力及差压变送器免拆解校验方法[J]. 油气储运, 2014, 33(2): 223-225. DOI: 10.6047/j.issn.1000-8241.2014.02.021
引用本文: 张石超, 钱祖国, 杨凡, 李键, 李洪烈. 西气东输站场压力及差压变送器免拆解校验方法[J]. 油气储运, 2014, 33(2): 223-225. DOI: 10.6047/j.issn.1000-8241.2014.02.021
ZHANG Shichao, QIAN Zuguo, YANG Fan, LI Jian, LI Honglie. Calibration method of pressure and differential pressure transmitter without dismantling in compressor station[J]. Oil & Gas Storage and Transportation, 2014, 33(2): 223-225. DOI: 10.6047/j.issn.1000-8241.2014.02.021
Citation: ZHANG Shichao, QIAN Zuguo, YANG Fan, LI Jian, LI Honglie. Calibration method of pressure and differential pressure transmitter without dismantling in compressor station[J]. Oil & Gas Storage and Transportation, 2014, 33(2): 223-225. DOI: 10.6047/j.issn.1000-8241.2014.02.021

西气东输站场压力及差压变送器免拆解校验方法

Calibration method of pressure and differential pressure transmitter without dismantling in compressor station

  • 摘要: 西气东输站场以往校验压力变送器、差压变送器时,需要拆解引压管接头、二阀组组件和五阀组组件上的排污管,然后连接校表仪器校验。通过对未带二阀组组件的压力变送器加装改进的二阀组组件、对已带二阀组组件的压力变送器和差压变送器的排污管加装校表专用接头的方法,实现了压力变送器、差压变送器校验时的免拆解。避免了由于多次拆解引起的引压管接头处易漏气、丝扣处易滑丝、引压管变形安装后产生应力等生产运行风险,减小了校表人员的工作量和设备在校表期间的不备用时间,相对提高了设备的可用率,可为解决类似管道问题提供参考借鉴。

     

    Abstract: When checking the pressure transmitter and differential pressure transmitter in compressor stations in West- to-East Natural Gas Pipeline in the past, the blow-off pipes on the pressure lead-in joint, two-valve group and five-valve group had to be disassembled, and then the transmitter was checked with calibration instruments. Through adding modified two-valve group to the pressure transmitter without two-valve group and adding a special joint to the blow-off pipe of the pressure transmitter and the differential pressure transmitter with two-valve group, the calibration of pressure and differential pressure transmitter without disassemble has been realized. In this way, the operation risks, such as the leakage of pressure lead-in joint after dismantling, screw thread sliding and stress created after the installation of pressure lead-in pipe, are avoided. Meanwhile, work load of the calibration worker and no standby time of the equipment in calibration period are reduced, the available rate of equipment is increased accordingly, which can provide a reference to the similar pipeline issues.

     

/