Abstract:
In view of a buried tank uplifting accident, this paper analyzes the cause of the accident based on the basic structure of the buried tank, and discusses countermeasures accordingly. Relevant calculation is carried out according to the stress analysis of the emptied tank. Results show that to uplift buried tanks of nominal capacity of 1 000 m
3, 2 000 m
3, 3 000 m
3, 5 000 m
3 and 10 000 m
3, it is only required that the water collection height and water collection volume in the tank chamber should reach 0.232 m, 0.223 m, 0.231 m, 0.218 m and 0.234 m and 3.636 m
3, 4.367 m
3, 5.290 m
3, 6.356 m
3 and 8.921 m
3 respectively, and even if the drain valve is totally open, when the water intake rate of the tank chamber exceeds 30 m
3/h, the emptied tank will be uplifted. Therefore, the paper proposes countermeasures for uplifting accidents in following aspects, including complete transformation, drainage leakage repair, strengthening management and design & construction, etc.