Abstract:
Taking the Xiangtan Compressor Station in Zhongxian-Wuhan Gas Transmission Pipeline as an example, from the angle of practical setup of water supply system flow, automation design of sewage disposal system, optimized running of primary energy consumption equipments and fining management of daily operating for compressor station, technical improvement methods taken and experiences obtained in the process of energy saving and consumption lowering work of compressor station are summarized, which can effectively promote the raising of comprehensive economic results for compressor station of gas transmission pipeline.