胡道华, 罗滔. 陕京二线工程建设中的土建问题与解决方案[J]. 油气储运, 2009, 28(3): 73-75. DOI: 10.6047/j.issn.1000-8241.2009.03.022
引用本文: 胡道华, 罗滔. 陕京二线工程建设中的土建问题与解决方案[J]. 油气储运, 2009, 28(3): 73-75. DOI: 10.6047/j.issn.1000-8241.2009.03.022
HU Daohua, LUO Tao. Civil Engineering Problems and Solution of West-to-East Parallel Gas Transmission Pipeline[J]. Oil & Gas Storage and Transportation, 2009, 28(3): 73-75. DOI: 10.6047/j.issn.1000-8241.2009.03.022
Citation: HU Daohua, LUO Tao. Civil Engineering Problems and Solution of West-to-East Parallel Gas Transmission Pipeline[J]. Oil & Gas Storage and Transportation, 2009, 28(3): 73-75. DOI: 10.6047/j.issn.1000-8241.2009.03.022

陕京二线工程建设中的土建问题与解决方案

Civil Engineering Problems and Solution of West-to-East Parallel Gas Transmission Pipeline

  • 摘要: 针对陕京二线工程建设中土建施工特点, 讨论了阀室基础设计的创新、各种地基处理方案以及冬季施工问题, 提出了解决这些问题的具体方案, 认为这些方案对管道的土建施工具有一定的指导意义。

     

    Abstract: Characteristics of civil engineering in West-to-East Parallel Gas Pipeline are discussed. Aiming at the characteristics of civil engineering in the long distance gas pipeline, innovations for foundation design of valve control chamber, treatment techniques of foundations and winter construction are discussed and optimization in design of block concrete foundations are discussed. Concrete problems arisen and solutions in civil engineering construction of the pipeline are introduced at the same time.

     

/