许志军, 孙素凤, 刘继和, 张鹏, 卢伟. 50000 m3浮顶油罐举升方案的可行性研究[J]. 油气储运, 2007, 26(3): 46-48, 56. DOI: 10.6047/j.issn.1000-8241.2007.03.014
引用本文: 许志军, 孙素凤, 刘继和, 张鹏, 卢伟. 50000 m3浮顶油罐举升方案的可行性研究[J]. 油气储运, 2007, 26(3): 46-48, 56. DOI: 10.6047/j.issn.1000-8241.2007.03.014
XU Zhijun, SUN Sufeng, . Feasibility Study on Integral Lifting Scheme of 50000 m3 Floating Root Storage Tank[J]. Oil & Gas Storage and Transportation, 2007, 26(3): 46-48, 56. DOI: 10.6047/j.issn.1000-8241.2007.03.014
Citation: XU Zhijun, SUN Sufeng, . Feasibility Study on Integral Lifting Scheme of 50000 m3 Floating Root Storage Tank[J]. Oil & Gas Storage and Transportation, 2007, 26(3): 46-48, 56. DOI: 10.6047/j.issn.1000-8241.2007.03.014

50000 m3浮顶油罐举升方案的可行性研究

Feasibility Study on Integral Lifting Scheme of 50000 m3 Floating Root Storage Tank

  • 摘要: 借鉴不同容积油罐整体举升的成功经验,设计了50000 m3浮顶油罐的举升方案,针对不同工况的方案组合进行了稳定性和局部强度的校核计算,在方案的可行性研究方面提出了需要考虑的问题。

     

    Abstract: With previous successful experiences in lifting tanks with different sizes, the authors put forward an integral lifting scheme for a 50000 m3 floating roof oil storage tank. The stability and partial stress the scheme involved in are calculated and verified for different operation conditions. Some problems in feasibility study of this scheme is brought forward.

     

/

返回文章
返回