扎纳诺尔—KC13输气管道冬季施工技术要求

Winter Construction Requirements on Zahnanor-KC13 Gas Transmission Pipeline

  • 摘要: 分别从气候环境、冬季管道施工技术措施、施工机具要求及其它防护措施等方面, 介绍了哈萨克斯坦扎纳诺尔—KC13天然气管道工程的冬季施工经验。阐述了管道冬季施工作业中应注意的工程技术问题。

     

    Abstract: This paper introduces the winter construction practice of Zahnanor-KC13 Gas Transmission Pipeline of Kazakhstan in weather, technical measurements in winter construction of gas pipeline, the requirements on construction equipments and tools and protection methods, and presents some problems to be focused on during winter construction of gas pipeline.

     

/