唐白河管道穿越改造工程安全评价

Safety Assessment on Pipeline Reinforcement of Tangbaihe River Pipeline Crossing Segment

  • 摘要: 针对魏荆输油管道唐白河穿越段在改造过程中存在的水文及岩土工程问题, 从实际情况出发, 对施工过程中的安全问题进行了分析, 并提出了解决方法。该评价对管道穿越工程的施工具有一定的指导意义。

     

    Abstract: Tangbaihe River pipeline crossing segment is 500 m long, because natural and human factors, the operation condition of this pipe segment does not meet the needs of safety standard. Based on the geological analysis results, systematical reinforcement measures are taken. The safety assessment is made on the reinforcement. The authors consider that the reinforcement method is feasible in technology.

     

/