西气东输工程压气站工艺流程设计
Technological Process Design of Gas Compressor Station in West-to-East Gas Pipeline Project
-
摘要: 介绍了西气东输天然气管道大型压气站的设计工艺过程, 给出了压力站逻辑控制具体工作过程和压气站设计参数。在具体流程设计中提出的对站场布局、安全保护以及辅助设施的设计思路, 可为其它大型压气站设计提供参考。Abstract: The technological process design for large-scale gas compressor station of West-to-East Gas Pipeline Project is introduced.This article presents logic control and design parameters for large-scale gas compressor station.The design conception of the allocation of gas compressor stations, safe protection and auxiliary facilities is presented, which can provide a design reference to other large-scale gas compressor station.