Abstract:
The gas storage and peak shaving with pipeline is an important base for the pipeline proprietor to execute the"take or pay"contract signed with gas users.This paper analyzes the differences of gas users and the conditions influencing peak shaving under the condition of single resource and multi-user, and calculates the gas supply load of, pipeline.Two methods in gas storage and peak shaving with single resource and multi-user pipeline are introduced.Take West-to-East Gas Pipeline Project as an example, the factors influencing gas storage and peak shaving of pipeline are studied, and program to eliminate the factors is put forward.